Nileage
El Tor |
ElTor
1.jpg
2.jpg
3.jpg
4.jpg
5.jpg
6.jpg
Capacity | 30000 m3/day |
Owner | National Organization For Potable water & Sanitary Drainage |
Main Contractor | Ministry of defense – Water Department |
Sub-Contractor | METITO |
Client | METITO |
EL TOR sea water desalination plant is located in North Sinai.EL TOR sea water desalination plant designed by using reverse osmosis technology using Pressure Exchanger (PX) as an energy recovery system with capacity 30,000 m3/day ( 6 RO skids with capacity of each one 5,000 m3/day).
Water Treatment consultant office (WTCO) use the latest technologies in desalination process to accomplish
- Stability, Durability and reliability of operation under different conditions to insure the product water quality and quantity.
- Product water quality that match standard limits/Codes.
- Reduction CAPEX without affecting technical specifications and product water quality.
- Reduction OPEX without affecting technical specifications and product water quality.
- Insure suitable area for operation and maintenance without any obstacles.
Water Treatment Consultant Office (WTCO) is unique by offering our designs and calculation of process in desalination plants in 3D drawing which facilitate the installation and operating of plants and manage us to establish plants without problems.
In El Tor Seawater desalination plant our responsibility is :-
- Process Design.
- Substation Design.
- Sites general arrangement.
- Planning and preparation working drawings and bills of quantities for electro-mechanical works.
- Tender documents preparation.
- Technical evaluation.
- Supervising the erection.
- Commissioning.and start up.
Latest News |
Services |
El Sheikh Zowyed |
El Sheikh Zowyed
1.jpg
2.jpg
3.jpg
4.jpg
5.jpg
6.jpg
7.jpg
9.jpg
10.jpg
8.jpg
Capacity | 6000 m3/day |
Owner | National Organization For Potable water & Sanitary Drainage |
Main Contractor | Ministry of defense – Water Department |
Sub-Contractor | VWS Egypt LLC |
Client | VWS Egypt LLC |
Water Treatment consultant office (WTCO) use the latest technologies in desalination process to accomplish
- Stability, Durability and reliability of operation under different conditions to insure the product water quality and quantity.
- Product water quality that match standard limits/Codes.
- Reduction CAPEX without affecting technical specifications and product water quality.
- Reduction OPEX without affecting technical specifications and product water quality.
- Insure suitable area for operation and maintenance without any obstacles.
Water Treatment Consultant Office (WTCO) is unique by offering our designs and calculation of process in desalination plants in 3D drawing which facilitate the installation and operating of plants and manage us to establish plants without problems.
In El Sheikh Zowyed Seawater desalination plant our responsibility is :-
- Process description.
- Design philosophy.
- RO projection.
- Energy recovery device selection.
- Design report.
- Drawings.
- Equipment specification.
- BOM.
- Prices review.
- Supervision of erection.
- Supervision of Commissioning and startup.