Nekhel

Nekhel

Capacity 400 m3/day
Owner National Organization For Potable water & Sanitary Drainage
Main Contractor Ministry of defense – Water Department
Sub-Contractor SOUL water
Client SOUL water
Nekhel  brackish water desalination plant is located in Sinai. NEKHEL brackish water reverse osmosis desalination plantdesigned to be set in a container. It consists of two plants with capacity 200 m3/day (2 x 200 m3/day).

Water Treatment Consultant Office (WTCO) is unique by offering our designs and calculation of process in desalination plants in 3D drawing which facilitate the installation and operating of plants and manage us to establish plants without problems.

In NEKHEL brackish water desalination plant our responsibility is:-

  • Process Design.
  • Substation Design.
  • Planning and preparation working drawings and bills of quantities for electromechanical works.
  • Supervising the erection.
  • Commissioning.and start up.

El Qusier

El Qusier

Capacity 22500 m3/day
Owner Red Sea Water & Waste Water
Main Contractor  
Sub-Contractor  
Client Red Sea Water & Waste Water


 

In El Qusier Seawater desalination plant our responsibility is:-

  • Process Design.
  • Substation Design.
  • Sites general arrangement.
  • Planning and preparation working drawings and bills of quantities for electromechanical works.
  • Tender documents preparation.
  • Technical evaluation.
  • Supervising the erection.
  • Commissioning.and start up.

Amwaj

Amwaj

Capacity 6000 m3/day
Owner ERA Commercial Egypt
Main Contractor WATER ENGINEERING
Sub-Contractor  
Client WATER ENGINEERING

In AMWAJ Seawater desalination plant our responsibility is:-

  • Process Design.
  • Substation Design.
  • Sites general arrangement.
  • Planning and preparation working drawings and bills of quantities for electromechanical works.
  • Technical evaluation.
  • Supervising the erection.
  • Commissioning.and start up.

Marasi

Marasi

Capacity 2500 m3/day
Owner Emaar Misr for Development S.A.E
Main Contractor IETOS
Sub-Contractor  
Client IETOS


 

In MARASI Seawater desalination plant our responsibility is:-

  • Process Design
  • Piping and Instrumentation
  • Sites general arrangement Review
  • Single Line Diagram

El Shiekh Zwaied

El Shiekh Zwaied

Capacity 5000 m3/day
Owner National Organization For Potable water & Sanitary Drainage
Main Contractor KAHA Company for Chemical Industries
Sub-Contractor  OVIVO AQUA AUSTRIA
Client OVIVO AQUA AUSTRIA


El Shiekh Zwaied sea water Reverse Osmosis desalination plant designed to be operate by using Turbo charger as an energy recovery.

In El Shiekh Zwaied Seawater desalination plant our responsibility is:-

  • Supervision of erection
  • Supervision of commissioning and start up
  • Training

Rafah

Rafah

Capacity 6200 m3/day
Owner Water Department - Ministry of Defense
Main Contractor The Arab Contractors
Sub-Contractor WATER ENGINEERING
Client WATER ENGINEERING


Rafah sea water Reverse Osmosis desalination plant designed to be operate by using Turbo charger as an energy recovery.

In Rafah Seawater desalination plant our responsibility is:-

  • Supervision of erection
  • Supervision of commissioning and start up
  • Training

Mountain View

Mountain View

Capacity 5000 m3/day
Owner MOUNTAIN VIEW RESORT NORTH COAST
Main Contractor WATER ENGINEERING
Sub-Contractor  
Client WATER ENGINEERING

Scope of work:
The technical assistance services in connection with:

  • Planning and preparation working drawings and bills of quantities for electromechanical works
  • Supervising the erection.
  • Commissioning and startup.
  • The project located partially in Egypt at MarsaMatrouh Governorate on September 2013.

Abo Redies

Abo Redies

Capacity 3000 m3/day
Owner Water Department - Ministry of Defense
Main Contractor The Arab Contractors
Sub-Contractor WATER ENGINEERING
Client WATER ENGINEERING


Abo Redies sea water Reverse Osmosis desalination plant designed to be operate by using Turbo charger as an energy recovery.

In Abo Redies Seawater desalination plant our responsibility is:-

  • Planning and preparation working drawings and bills of quantities for electromechanical works
  • Supervision of erection
  • Supervision of commissioning and start up
  • Training

Calcite Contactors

Calcite Contactors

Capacity 3000 m3/day
Owner Water Department - Ministry of defense
Main Contractor TAKWA EXPORT
Sub-Contractor  
Client TAKWA EXPORT

Our responsibility is:-

  • Design
  • Supervision manufacturing
  • Commissioning & Start up

Sidi Barani

Sidi Barani

Capacity 2000 m3/day
Owner National Organization For Potable water & Sanitary Drainage
Main Contractor ARAB CONTARCTORS – ALEXANDRIA BRANCH
Sub-Contractor INTEK
Client ARAB CONTARCTORS – ALEXANDRIA BRANCH
Sidi Barani sea water Reverse Osmosis desalination plant designed to be operate by using PX as an energy recovery, it consists of two trains with capacity 1000 m3/d (2 x 1000 m3/d).

In Sidi Barani Seawater desalination plant our responsibility is:-

  • Process Design.
  • Substation Design.
  • Sites general arrangement.
  • Planning and preparation working drawings and bills of quantities for electromechanical works.
  • Tender documents preparation.
  • Technical evaluation.
  • Supervising the erection.
  • Commissioning.and start up.
الصفحة 2 من 2

إتصل بنا

  • 8 سمير عبد الرؤوف متفرع من مكرم عبيد - الدور الرابع - شقة 6 - القاهرة - مصر
  • تليفون: (+202)24116177  (+202)26701268
  • موبيل: (+202)01128670000 / (+202)01100990868
  • فاكس: (+202)24116177
  • إميل: عنوان البريد الإلكتروني هذا محمي من روبوتات السبام. يجب عليك تفعيل الجافاسكربت لرؤيته.

أرسل لنا رسالة

  Mail is not sent.   Your email has been sent.
We use cookies to improve our website. By continuing to use this website, you are giving consent to cookies being used. Cookie policy. I accept cookies from this site. Agree