Nileage
Email: عنوان البريد الإلكتروني هذا محمي من روبوتات السبام. يجب عليك تفعيل الجافاسكربت لرؤيته.
Calcite Contactors |
Capacity | 3000 m3/day |
Owner | Water Department - Ministry of defense |
Main Contractor | TAKWA EXPORT |
Sub-Contractor | |
Client | TAKWA EXPORT |
Our responsibility is:-
- Design
- Supervision manufacturing
- Commissioning & Start up
Latest News |
Services |
Sidi Barani |
Capacity | 2000 m3/day |
Owner | National Organization For Potable water & Sanitary Drainage |
Main Contractor | ARAB CONTARCTORS – ALEXANDRIA BRANCH |
Sub-Contractor | INTEK |
Client | ARAB CONTARCTORS – ALEXANDRIA BRANCH |
Sidi Barani sea water Reverse Osmosis desalination plant designed to be operate by using PX as an energy recovery, it consists of two trains with capacity 1000 m3/d (2 x 1000 m3/d).
In Sidi Barani Seawater desalination plant our responsibility is:-
- Process Design.
- Substation Design.
- Sites general arrangement.
- Planning and preparation working drawings and bills of quantities for electromechanical works.
- Tender documents preparation.
- Technical evaluation.
- Supervising the erection.
- Commissioning.and start up.
Latest News |
Services |