Desalination (31)

Al Arish

Al Arish

Capacity 5000 m3/day
Owner National Organization For Potable water & Sanitary Drainage
Main Contractor UNIHA - ORASCOM
Sub-Contractor  
Client UNIHA
AL ARISH sea water Reverse Osmosis desalination plant designed to be operate by using hydraulic turbo charger as an energy recovery, the plant capacity is 5000 m3/d, it consists of two trains each with capacity 2500 m3/d.

In Al ARISH Seawater desalination plant our responsibility is:-

  • Supervision of erection
  • Supervision of commissioning and start up.
  • Training. 

 

Al Galalah

Al Galalah

Capacity 150000 m3/day
Owner National Organization For Potable water & Sanitary Drainage
Main Contractor Ministry of defense – Water Department
Sub-Contractor VWS Egypt LLC
Client VWS Egypt LLC


AL GALALA sea water desalination plant is located on the RED SEA on the Suez gulf .it consider the largest sea water desalination plant by using reverse osmosis technology with capacity 150,000 m3/day ( 10 RO skids with capacity of each one 15,000 m3/day).

Water Treatment consultant office (WTCO) use the latest technologies in desalination process to accomplish

  • Stability, Durability and reliability of operation under different conditions to insure the product water quality and quantity.
  • Product water quality that match standard limits/Codes.
  • Reduction CAPEX without affecting technical specifications and product water quality.
  • Reduction OPEX without affecting technical specifications and product water quality.
  • Insure suitable area for operation and maintenance without any obstacles.

Water Treatment Consultant Office (WTCO) is unique by offering our designs and calculation of process in desalination plants in 3D drawing which facilitate the installation and operating of plants and manage us to establish plants without problems.

In Al GALALA Seawater desalination plant our responsibility is :-

  • Marine Works
  • Process Flow Diagram
  • Piping & instrumentations Drawings
  • General Arrangement Drawings
  • Single Line Diagram
  • Civil Guide Drawings
  • Control Architecture
  • I/O list
  • Cable Routing & Cable List
  • Electromechanical Work Shop Drawings
  • Bill of Quantities

El Tor

El Tor

Capacity 30000 m3/day
Owner National Organization For Potable water & Sanitary Drainage
Main Contractor Ministry of defense – Water Department
Sub-Contractor METITO
Client METITO

EL TOR sea water desalination plant is located in North Sinai.EL TOR sea water desalination plant designed by using reverse osmosis technology using Pressure Exchanger (PX) as an energy recovery system with capacity 30,000 m3/day ( 6 RO skids with capacity of each one 5,000 m3/day).

Water Treatment consultant office (WTCO) use the latest technologies in desalination process to accomplish 

  • Stability, Durability and reliability of operation under different conditions to insure the product water quality and quantity.
  • Product water quality that match standard limits/Codes.
  • Reduction CAPEX without affecting technical specifications and product water quality.
  • Reduction OPEX without affecting technical specifications and product water quality.
  • Insure suitable area for operation and maintenance without any obstacles.

Water Treatment Consultant Office (WTCO) is unique by offering our designs and calculation of process in desalination plants in 3D drawing which facilitate the installation and operating of plants and manage us to establish plants without problems.

In El Tor Seawater desalination plant our responsibility is :-

  • Process Design.
  • Substation Design.
  • Sites general arrangement.
  • Planning and preparation working drawings and bills of quantities for electro-mechanical works.
  • Tender documents preparation.
  • Technical evaluation.
  • Supervising the erection.
  • Commissioning.and start up.

Al Yousr

Al Yousr

Capacity 80000 m3/day
Owner National Organization For Potable water & Sanitary Drainage
Main Contractor Ministry of defense – Water Department
Sub-Contractor METITO
Client Ministry of Defense - Water Department


Al Yousr sea water Reverse Osmosis desalination plant designed to operate with two pass system and it is considered as two plants with capacity 40000 m3/day for each plant. Plant is designed to be operate by using PX as an energy recovery.

In AL YOUSR Seawater desalination plant our responsibility is:-

  • Design review
  • Supervision of erection
  • Supervision of commissioning and start up

Al Arish Cement Factory

Al Arish Cement Factory

Capacity 3600 m3/day
Owner Ministry of defense – Water Department
Main Contractor Sinoma
Sub-Contractor  
Client Sinoma


Al Arish Cement Factory brackish water desalination plant is located in Sinai. AL ARISH CEMENT FACTORY brackish water reverse osmosis desalination plant designed to be consist of two stages, the first stage by using high pressure pump and the second stage by using Turbo charger. AL ARISH CEMENT FACTORY is considered the first plant to use the turbo charger in the second stage with capacity 3,600 m3/day

Water Treatment consultant office (WTCO) use the latest technologies in desalination process to accomplish

  • Stability, Durability and reliability of operation under different conditions to insure the product water quality and quantity.
  • Product water quality that match standard limits/Codes.
  • Reduction CAPEX without affecting technical specifications and product water quality.
  • Reduction OPEX without affecting technical specifications and product water quality.
  • Insure suitable area for operation and maintenance without any obstacles.

Water Treatment Consultant Office (WTCO) is unique by offering our designs and calculation of process in desalination plants in 3D drawing which facilitate the installation and operating of plants and manage us to establish plants without problems.

In Al Arish Cement Factory Brackish Water Desalination plant our responsibility is :-

  • Process Design.
  • Substation Design.
  • Sites general arrangement.
  • Planning and preparation working drawings and bills of quantities for electro-mechanical works.
  • Tender documents preparation.
  • Technical evaluation.
  • Supervising the erection.
  • Commissioning.and start up.

Al Arish

Al Arish

Capacity 10000 m3/day
Owner National Organization For Potable water & Sanitary Drainage
Main Contractor Ministry of defense – Water Department
Sub-Contractor VWS Egypt LLC
Client VWS Egypt LLC


AL ARISH sea water desalination plant is located in Sinai. AL ARISHsea water desalination plantdesigned by using reverse osmosis technology using Turbo charger as an energy recovery system with capacity 10,000 m3/day ( 8 RO skids with capacity of each one 1,500 m3/day).

Water Treatment consultant office (WTCO) use the latest technologies in desalination process to accomplish

  • Stability, Durability and reliability of operation under different conditions to insure the product water quality and quantity.
  • Product water quality that match standard limits/Codes.
  • Reduction CAPEX without affecting technical specifications and product water quality.
  • Reduction OPEX without affecting technical specifications and product water quality.
  • Insure suitable area for operation and maintenance without any obstacles.

Water Treatment Consultant Office (WTCO) is unique by offering our designs and calculation of process in desalination plants in 3D drawing which facilitate the installation and operating of plants and manage us to establish plants without problems.

In Al Arish Seawater desalination plant our responsibility is :-

  • Process Design.
  • Substation Design.
  • Sites general arrangement.
  • Planning and preparation working drawings and bills of quantities for electro-mechanical works.
  • Tender documents preparation.
  • Technical evaluation.
  • Supervising the erection.
  • Commissioning.and start up.

Rafah

Rafah

Capacity 5000 m3/day
Owner National Organization For Potable water & Sanitary Drainage
Main Contractor KAHA Company for Chemical Industries
Sub-Contractor  OVIVO AQUA AUSTRIA
Client OVIVO AQUA AUSTRIA


Rafah sea water Reverse Osmosis desalination plant designed to be operate by using Turbo charger as an energy recovery.

In Rafah Seawater desalination plant our responsibility is:-

  • Supervision of erection
  • Supervision of commissioning and start up
  • Training

Marsa Allam

Marsa Allam

Capacity 1500 m3/day
Owner Red Sea Water & Waste Water
Main Contractor  
Sub-Contractor  
Client Red Sea Water & Waste Water

In Marsa Allam Seawater desalination plant our responsibility is:-

  • Process Design.
  • Substation Design.
  • Sites general arrangement.
  • Planning and preparation working drawings and bills of quantities for electromechanical works.
  • Tender documents preparation.
  • Technical evaluation.
  • Supervising the erection.
  • Commissioning.and start up.

El Sheikh Zowyed

El Sheikh Zowyed

Capacity 6000 m3/day
Owner National Organization For Potable water & Sanitary Drainage
Main Contractor Ministry of defense – Water Department
Sub-Contractor VWS Egypt LLC
Client VWS Egypt LLC
El Sheikh Zowyed sea water desalination plant is located in Saini.EL-SHEIKH ZOWAYED sea water desalination plant designed by using reverse osmosis technology using Turbo charger as an energy recovery system with capacity 6,000 m3/day ( 4 RO skids with capacity of each one 1,500 m3/day).

Water Treatment consultant office (WTCO) use the latest technologies in desalination process to accomplish

  • Stability, Durability and reliability of operation under different conditions to insure the product water quality and quantity.
  • Product water quality that match standard limits/Codes.
  • Reduction CAPEX without affecting technical specifications and product water quality.
  • Reduction OPEX without affecting technical specifications and product water quality.
  • Insure suitable area for operation and maintenance without any obstacles.

Water Treatment Consultant Office (WTCO) is unique by offering our designs and calculation of process in desalination plants in 3D drawing which facilitate the installation and operating of plants and manage us to establish plants without problems.

In El Sheikh Zowyed Seawater desalination plant our responsibility is :-

  • Process description.
  • Design philosophy.
  • RO projection.
  • Energy recovery device selection.
  • Design report.
  • Drawings.
  • Equipment specification.
  • BOM.
  • Prices review.
  • Supervision of erection.
  • Supervision of Commissioning and startup.

Abo Tawila

Abo Tawila

Capacity 200 m3/day
Owner National Organization For Potable water & Sanitary Drainage
Main Contractor Ministry of defense – Water Department
Sub-Contractor Water Engineering
Client Water Engineering


Abo Tawila brackish water desalination plant is located in Sinai. ABO TAWILA brackish water reverse osmosis desalination plantdesigned to be set in a container.

Water Treatment Consultant Office (WTCO) is unique by offering our designs and calculation of process in desalination plants in 3D drawing which facilitate the installation and operating of plants and manage us to establish plants without problems.

In ABO TAWILA brackish water desalination plant our responsibility is:-

  • Process Design.
  • Substation Design.
  • Planning and preparation working drawings and bills of quantities for electro-mechanical works.
  • Supervising the erection.
  • Commissioning.and start up.
الصفحة 1 من 3

إتصل بنا

  • 8 سمير عبد الرؤوف متفرع من مكرم عبيد - الدور الرابع - شقة 6 - القاهرة - مصر
  • تليفون: (+202)24116177  (+202)26701268
  • موبيل: (+202)01128670000 / (+202)01100990868
  • فاكس: (+202)24116177
  • إميل: عنوان البريد الإلكتروني هذا محمي من روبوتات السبام. يجب عليك تفعيل الجافاسكربت لرؤيته.

أرسل لنا رسالة

  Mail is not sent.   Your email has been sent.
We use cookies to improve our website. By continuing to use this website, you are giving consent to cookies being used. Cookie policy. I accept cookies from this site. Agree