Al Arish Cement Factory |
alarishcementfactory
01.jpg
http://nileage.com/wtco/01/images/Projects/alarishcement/01.jpg
02.jpg
http://nileage.com/wtco/01/images/Projects/alarishcement/02.jpg
03.jpg
http://nileage.com/wtco/01/images/Projects/alarishcement/03.jpg
04.jpg
http://nileage.com/wtco/01/images/Projects/alarishcement/04.jpg
05.jpg
http://nileage.com/wtco/01/images/Projects/alarishcement/05.jpg
06.jpg
http://nileage.com/wtco/01/images/Projects/alarishcement/06.jpg
08.jpg
http://nileage.com/wtco/01/images/Projects/alarishcement/08.jpg
09.jpg
http://nileage.com/wtco/01/images/Projects/alarishcement/09.jpg
07.jpg
http://nileage.com/wtco/01/images/Projects/alarishcement/07.jpg
Capacity | 3600 m3/day |
Owner | Ministry of defense – Water Department |
Main Contractor | Sinoma |
Sub-Contractor | |
Client | Sinoma |
Al Arish Cement Factory brackish water desalination plant is located in Sinai. AL ARISH CEMENT FACTORY brackish water reverse osmosis desalination plant designed to be consist of two stages, the first stage by using high pressure pump and the second stage by using Turbo charger. AL ARISH CEMENT FACTORY is considered the first plant to use the turbo charger in the second stage with capacity 3,600 m3/day
Water Treatment consultant office (WTCO) use the latest technologies in desalination process to accomplish
- Stability, Durability and reliability of operation under different conditions to insure the product water quality and quantity.
- Product water quality that match standard limits/Codes.
- Reduction CAPEX without affecting technical specifications and product water quality.
- Reduction OPEX without affecting technical specifications and product water quality.
- Insure suitable area for operation and maintenance without any obstacles.
Water Treatment Consultant Office (WTCO) is unique by offering our designs and calculation of process in desalination plants in 3D drawing which facilitate the installation and operating of plants and manage us to establish plants without problems.
In Al Arish Cement Factory Brackish Water Desalination plant our responsibility is :-
- Process Design.
- Substation Design.
- Sites general arrangement.
- Planning and preparation working drawings and bills of quantities for electro-mechanical works.
- Tender documents preparation.
- Technical evaluation.
- Supervising the erection.
- Commissioning.and start up.
Latest News |
Services |